Great South Wall and Bullock Harbour
Site Investigation carried out to obtain information for the rehabilitation of the Great South Wall and Bullock Harbour. In 2016, IDL carried out boreholes and trial pits in very challenging conditions with very difficult ‘running’ sands and gravels and with borehole depths of up to 50m.
-
Client
-
LocationOughterard/Moycullen
-
Year2014
-
CategoriesInfrastructure Over Water
-